Carrier operating and maintanance Instrukcja Operatora Strona 24

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 23
Rev. __________
Date _________
2.6
4. Roll
Raise the roll handle and the deck will slide back. Continue this operation
until the approach plate has contacted the ground.Make sure that the rear
bumper and the approach plate are both in firm contact with the ground
before unloading. There should be an equal weight distribution between
the rear bumper and the end of the deck.
5. Winch
Winch the load off of the deck. Refer to the Winch Operation Manual for
specific winch operation procedures.
5a. Ensure that the winch cable is securely attached to the
load and is taut. Ensure that the winch clutch is fully
engaged (the winch is NOT in free spool mode.)
5b. Remove all equipment used to secure the load to the deck
(excluding the winch cable). Release brakes of the load (if
applicable).
5c. Raise the winch control to power unreel the cable from the
drum, lowering the load from the deck.
5d. Secure the load on the ground Remove the winch cable
from the lod and store the cable.
CAUTION: Never disengage the winch clutch when the winch is
under load.
CAUTION: Always maintain a minimum of 5 wraps of cable on the
winch drum.
CAUTION: Always winch load off of the deck, NEVER drive equip-
ment on the tilted deck.
4
5
Przeglądanie stron 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29 ... 43 44

Komentarze do niniejszej Instrukcji

Brak uwag