10.11. Coolers
-Check the connections in accordance with the di-
mensional drawing.
-Control the connections for leaks.
-Check drain trap. If Alarko Carrier standard siphon
trap is used,check it has been correctly installed.
Check if siphon cover and ball have been correctly
installed.
-Check if the droplet eliminator after the cooler has
been correctly installed.
-Check if fins have been bent during transport. Cor-
rectly straighten the fins.
10.10. Siphon
It is advised to use siphon to have a constant water
drain at all the outlets of the cooling coil, humidifier
and other wet areas of the Air Handling Units.
Siphon application is very important not to have
air suction or leakage from these outlets and also
draining the water without overflow which may move
inside the unit.
Fo the sizing of the siphon, static pressure of the
location must be considered.
For the positive and negative pressures it is mandotary
to use different siphons (See Figure 53 and 54).
Before start up the unit fill, the positive pressure
siphon with water.
Negative pressure siphon may only be applicable for
negative drainage. Negative pressure siphon can be
set up as in Figure 53. In Figure 55, parts and mon-
tage order of siphon are given.
The ball inside the negative pressure siphon pro-
vides drained water fill the siphon by preventing air
suction.
PRESSURE
Water drain direction marked with an arrow on the
negative pressure siphon.
Application types according to the pressure and
siphon types are shown in Figure 56.
Air Handling Unit base frame height can either be 62
mm. or 160 mm. There is no need to make an extra
base for the AHUs with 160 mm. base frame.
For 62 mm. base frames, a base shown in Figure 54
is necessary. The constructed base should be leveled
and balanced
For AHU with NPU profile concrete base requirement
and height must be checked and AHU installation
area must be prepared acoording to the above ex-
planations.
Figure 55.
Figure 53.
- Negative pressure siphone
Figure 54.
- Positive pressure siphone
Figure 56.
R=(P/10) - 30
P [Pa] : Cihaz içi negatif basnç. (-) işareti kullanlmadan hesap yaplmal.
R [mm] : Yoğuşma tavas boru çkşnda, borunun alt noktasndan zemine olan mesafe.
Formülle bulunan R değerinin daha büyük olarak ayarlanmasnda herhangi bir saknca yoktur.
Przeglądanie stron 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29 ... 40 41

Komentarze do niniejszej Instrukcji

Brak uwag