Figure 30-1.
Stacking, indoor location with interme-
diate base frame
Figure 30-2.
Fixing profile, indoor location with inter-
mediate base frame
There is no need for a connection profile at the ends
of the unit.
NOTE: The maximum distance between two
connection profiles is 960 mm. For greater distances
connection profiles should be installed on the
operation side and non-operation side.
Outdoor Installation
For an outdoor installation, the connection profiles
supplied need to be cut to the correct length. These
profiles should be mounted over the entire unit length
and width.
Figure 31.
Stacking, outside location
Bear in mind that different connection profiles are
used for the length and width directions of the cabi-
net.
Length direction: Cut the connection profile sup-
plied to the correct length and mount it as described
below.
Figure 32.
Fixing profile, length direction, unit with
intermediate base frame
Cross section of length direction (A-A)
Width direction: Cut the supplied connection profile
to the correct length and mount it in the way given
below.