Page : 31 of 42
Chiller Maintenance
Lesson Plan
#:
NMH30C000105
4) Rework per 13-EN-306 and VTM-C150-0001.
5) Due to the connections physical location, ensure the spade lug connections are tight.
6) Also check the box cover gasket condition
Good work practices:
DMWO# 854746 was written due to the frequent failures (resulting from the high heat conditions)
and equipment obsolescence. Extra care should be taken when checking the wiring and
connections. Although the decision has been made to replace the existing control panels for the
large normal chillers it will take time before all the panels are replaced.
De mo
Demonstrate performance of the electrical terminal inspection.
Perform a hazard assessment. Ask the trainee to identify the PPE requirements for this task.